Orven Branch Candler Chandelier
Couldn't load pickup availability
Product Details
Product Details
Product Details
- Dimensions: 6 heads D 106cm × H 60cm / ∅ 41.7″ × H 23.6″ or 8 heads D 106cm × H 60cm / ∅ 41.7″ × H 23.6″
- Chain Length: 19.7″ (50cm) — adjustable
- Body Material: Brass
- Shade Material: Fabric
- Available Body Colors: Black, Brass, Nickel
- Shade Color: White
- Socket Type: E12 or E14 Candelabra Base
- Bulb Included: No
- Dimmable: Yes, with a compatible bulb and dimmer switch
- Wiring: Hardwired
Download Support
Download Support
Secure Payment
Secure Payment
Trusted secure payment, currently accept major credit cards (VISA, Mastercard, AMEX, etc.) and PayPal. Fortified with advanced SSL encryption technology, provides a reliable shield to safeguard your sensitive personal and financial information.
Return Policy
Return Policy
Upon delivery of the goods, you will promptly examine them. If any of the goods ordered have been damaged in transit or have been incorrectly shipped, does not meet your requirements or are defective through faulty material or factory workmanship. Please kindly notify us by writing to us through email at contact@neutraldecor.co.uk within 30 days from the date of delivery of the relevant goods.
Lamp Knowledge Science
Lamp Knowledge Science
*A general explanation of the product features for all lighting fixtures. It doesn't mean the product on the current page is dimmable or three colours changeable.
Please check the Description section to find whether the current product is dimmable or not.
- Dimmable version: equipped with a remote control, and can adjust the brightness and colour temperature of the light, not compatible with dimmers.
- Triac Dimmable (Wall Switch Control): Compatible with most standard LED silicon-controlled (Triac) wall dimmers(not included). This version allows you to adjust brightness via your existing wall switch but does not include a remote.
- Three-colour changed by switch version: Controlled by a standard wall switch(not included), allowing you to adjust the color temperature of the light. This version does not have a memory function. Each time the light is turned on, it will reset to the default setting.
Size Tolerance Notice:
All dimensions are manually measured. Due to the unique shapes or craftsmanship of certain lighting fixtures, a deviation of 1-3cm is within the normal range. Please refer to the actual product received for precise installation.
Colour Disclaimer:
Actual colours may vary slightly due to different monitor settings, room ambient light, or the colour temperature of the bulbs used. We appreciate your understanding.
Measuring for Pendant Lighting
Kitchen
Dining Room
Bedroom
Size Chart
| SIZE | DIA 5-15 cm | DIA 15-30 cm | DIA 30-45 cm | DIA 45-60cm | DIA 45-90cm | DIA 80-100cm |
| AREA | 3-5 ㎡ | 15-30 ㎡ | 30-45 ㎡ | 45-60 ㎡ | 45-90 ㎡ | 80-100 ㎡ |
| ROOM | BATHROOM | DINING ROOM | KITCHEN | BEDROOM | LIVING ROOM | LOBBY/HALL |



